Home / Products

Products

26 product lines. Add what you need to your quote list and send it in one request.

Flow control

Pumps

Heat transfer and pressure

  • Heat exchangers and air coolers

    Typical elsewhere: 18–30 months for air-cooled condensers. Ours: 10–14 months, confirmed with your quote.

    Shell-and-tube exchangers, API 661 air coolers, air-cooled condensers and plate exchangers.

  • ASME VIII vessels, scrubbers and filter separators, API 650 storage tanks.

Power distribution

Backup power

  • Backup generators

    Typical elsewhere: 22–26 months from major brands. Ours: 3–6 months, confirmed with your quote.

    1–3 MW diesel and natural-gas generator sets for data centres and critical sites.

  • UPS and DC power

    Typical elsewhere: 30–52 weeks. Ours: 8–12 weeks, confirmed with your quote.

    Three-phase UPS, lithium-ion battery cabinets and high-voltage DC power systems.

Cooling

Energy storage

  • Containerized lithium-iron-phosphate storage, supplied with North American integrators.

Gas plant systems

Parts to drawing

Field services

Robot cells

  • Turnkey palletizing for cases and bags, typically C$49,000–69,000 installed.

  • Robots that load and unload CNC machines so they keep running between shifts.

  • Overhead parallel robots with vision for picking and packing at 80–120 picks per minute.

Tooling and service

Tell us what you need.

Send a spec, an equipment list or just a description. You'll get a budget price and an indicative delivery date within one business day.