Home / Energy & grid
Equipment and field services for power plants, pipelines and heavy industry.
Gas-fired plants, substations, LNG, pipelines, oil sands and mines all wait on the same things: valves, pumps, heat exchangers, transformers and switchgear. We supply them with the certifications Canadian sites require, and we can often deliver faster than the usual channels.
Sound familiar?
- Long-lead equipment is setting your project schedule.
- Your outage window is fixed, but the parts and crews aren't.
- Incumbent pricing leaves no room in the budget.
Who we supply
| EPC contractors | Balance-of-plant packages quoted to your spec, with document packages and fixed delivery dates. |
|---|---|
| Power producers and utilities | Transformers, switchgear and spares on schedules your interconnection date can live with. |
| Oil, gas, LNG and pipeline operators | Valves, pumps, vessels and skids for projects and turnarounds, registered with a CRN where required. |
| Mines and heavy industry | Wear parts, pumps and in-situ repair that keep the plant running between shutdowns. |
Equipment we supply
Add items to your quote list and send them together. Lead times are confirmed in writing with each quote.
Flow control
Gate, globe, check, ball and butterfly valves, ½″ to 48″, ASME Class 150 to 2500.
Globe and rotary control valves, multi-turn and quarter-turn electric actuators.
ASME B16.5 / B16.47 flanges and B16.9 fittings in carbon, stainless and alloy steel.
Pumps
ANSI and API process pumps, slurry pumps and interchangeable high-chrome wear parts.
Heat transfer and pressure
Heat exchangers and air coolers
Typical elsewhere: 18–30 months for air-cooled condensers. Ours: 10–14 months, confirmed with your quote.
Shell-and-tube exchangers, API 661 air coolers, air-cooled condensers and plate exchangers.
ASME VIII vessels, scrubbers and filter separators, API 650 storage tanks.
Power distribution
Pad-mount and medium power transformers
Typical elsewhere: Up to 143 weeks for large power transformers. Ours: 12–18 months, confirmed with your quote.
500 kVA to 50 MVA for solar, storage, data-centre and industrial sites.
Medium-voltage switchgear and unit substations
Typical elsewhere: 60–80 weeks. Ours: Confirmed in writing with your quote.
5–38 kV metal-clad switchgear and unit substations built to North American practice.
Factory-built electrical rooms with switchgear, UPS, controls and HVAC installed and tested.
Gas plant systems
Filtering, heating, pressure-regulating and metering skids for turbines and engines.
SCR and oxidation catalysts for engines and turbines, CEMS shelters.
Filter houses, silencers, stacks, expansion joints and replacement filters.
Parts to drawing
Steel and alloy castings, open-die forgings and precision machining to your drawings.
Field services
Multi-tool tensioning with a record for every bolt, plus hydraulic torque and tensioning tools.
On-site line boring, flange facing and repair, including underwater dry-habitat welding.
Orbital and narrow-gap welding systems with weld monitoring for heavy fabrication.
Energy storage
Containerized lithium-iron-phosphate storage, supplied with North American integrators.
Tell us what you need.
Send a spec, an equipment list or just a description. You'll get a budget price and an indicative delivery date within one business day.