Power and cooling for data centres, on schedules that match your build.
AI data centres are being built faster than generators, UPS systems and switchgear can be delivered. We supply the electrical and cooling equipment between the utility connection and the rack, certified for Canada and supported locally.
Sound familiar?
- Generator and UPS lead times are longer than your construction schedule.
- Rack densities have outgrown air cooling.
- Every week of delay is a week of lost capacity.
Who we supply
| Developers and operators | Firm delivery dates for generators, UPS and switchgear, and a second source for critical equipment. |
|---|---|
| Electrical contractors | Switchgear, unit substations, busway and power modules built to 600 V Canadian practice. |
| Mechanical contractors | CDUs, dry coolers, chillers, pumps and valves for liquid and air cooling. |
| Builders of on-site power | Fuel gas skids, intake and exhaust systems, and emissions controls for engine and turbine plants. |
Start with backup power
Generators and the switchgear around them are usually the longest wait on a data-centre build.
We supply 1–3 MW generator sets with transfer switches and paralleling switchgear as one package, factory-tested together. Send your single-line diagram and target energization date, and we'll come back with a delivery date in writing.
Equipment we supply
Add items to your quote list and send them together. Lead times are confirmed in writing with each quote.
Backup power
Backup generators
Typical elsewhere: 22–26 months from major brands. Ours: 3–6 months, confirmed with your quote.
1–3 MW diesel and natural-gas generator sets for data centres and critical sites.
UPS and DC power
Typical elsewhere: 30–52 weeks. Ours: 8–12 weeks, confirmed with your quote.
Three-phase UPS, lithium-ion battery cabinets and high-voltage DC power systems.
Power distribution
Pad-mount and medium power transformers
Typical elsewhere: Up to 143 weeks for large power transformers. Ours: 12–18 months, confirmed with your quote.
500 kVA to 50 MVA for solar, storage, data-centre and industrial sites.
Medium-voltage switchgear and unit substations
Typical elsewhere: 60–80 weeks. Ours: Confirmed in writing with your quote.
5–38 kV metal-clad switchgear and unit substations built to North American practice.
Factory-built electrical rooms with switchgear, UPS, controls and HVAC installed and tested.
Overhead busway and tap-off units for data halls.
Cooling
Coolant distribution units, dry and adiabatic coolers, and air- or water-cooled chillers.
Pumps
ANSI and API process pumps, slurry pumps and interchangeable high-chrome wear parts.
Energy storage
Containerized lithium-iron-phosphate storage, supplied with North American integrators.
Gas plant systems
Filtering, heating, pressure-regulating and metering skids for turbines and engines.
SCR and oxidation catalysts for engines and turbines, CEMS shelters.
Filter houses, silencers, stacks, expansion joints and replacement filters.
Tell us what you need.
Send a spec, an equipment list or just a description. You'll get a budget price and an indicative delivery date within one business day.