Home / Products / Power distribution

Pad-mount and medium power transformers

500 kVA to 50 MVA for solar, storage, data-centre and industrial sites.

Go to quote list

Lead time
12–18 months, confirmed with your quote
Typical elsewhere
Up to 143 weeks for large power transformers
Used in
Energy & grid, Data centres

What it is

Transformers change voltage, stepping it down from the grid to what equipment can use, or up for transmission. They are the single longest wait on most electrical projects today.

Typical specifications

Pad-mount500–5,000 kVA, liquid-filled, loop or radial feed
Medium power5–50 MVA substation units
CoolingMineral oil or natural ester
StandardsCSA C88, CSA C2 series efficiency, IEEE C57

Typical ranges. Every unit is quoted and built to your datasheet.

Certifications and documents

  • CSA certified or field-evaluated
  • Factory acceptance test with witness option

Certificate and registration numbers are listed on each quote and in the document package. See quality and certifications.

Where it's used

  • Solar and storage sites
  • Data centres
  • Mines and oil sands
  • Industrial substations

Downloads

  • Datasheet (PDF), coming soon
  • Sample document package (PDF), coming soon

No sign-up needed. Need a drawing or CAD model now? Email quotes@orbix-placeholder.ca.

Related

Need pad-mount and medium power transformers?

Send a spec, an equipment list or just a description. You'll get a budget price and an indicative delivery date within one business day.